Volunteer Projects — Pacific Crest Trail Association
Mount Adams Ranger District
10/1/2008 to 9/30/2009
| Activity Summary |
| Scouting: | 14 |
| Tools: | 16 |
| Trail Maintenance (PCT): | 1697 |
| Training: | 34 |
| Training/Trail Maintenance: | 278 |
| Total Volunteer Hours: | 2039 |
| Activity Detail (most recent on top) |
| Project Date: | 9/18/2009 to 9/20/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Indian Heaven to Berry Mountain |
| Description: | Cleaned 17 drain dips. Removed berm and graded tread for 1/4 mile. Installed 32 check steps through 1/4 mile section at the base of Berry Mountain to slow erosion and raise tread. Built 9 tread drains, and modified water bar drain dip. |
Volunteers |
Hours |
| Bentz, Jerry | 11 |
| Booth, Jeff | 24 |
| Carr, Pete | 28 |
| Cobb, Roberta | 31 |
| Hawley, Bill | 75 |
| Hawley, Karla | 32 |
| Mahoskey, Conner | 24 |
| Smith, Jeremy | 24 |
| Project Total: 249 |
| Project Date: | 8/18/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Logout recent blowdown. |
Volunteers |
Hours |
| Linde, Tom | 6 |
| Thompson, Frani | 6 |
| Ward, Norm | 6 |
| Project Total: 18 |
| Project Date: | 8/8/2009 to 8/9/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Henry Panter |
| Location: | Between Muddy Meadow and Potato Hill |
| Description: | Reinstalled culvert |
Volunteers |
Hours |
| McMurtry, Joe | 14 |
| Panter, Henry | 22 |
| Project Total: 36 |
| Project Date: | 7/27/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Brushing with student success crew on PCT. |
Volunteers |
Hours |
| Linde, Tom | 11 |
| Project Total: 11 |
| Project Date: | 7/25/2009 to 7/26/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bob Arkes |
| Location: | Road 23 to Horshoe Meadow |
| Description: | Cleaned drain dips and brushed. Installed 14 new water bars about 2 miles from trailhead. Repaired about 1/3 mile of tread between wilderness boundary and Stagman Ridge Trail. |
Volunteers |
Hours |
| Arkes, Bob | 19 |
| Arkes, Jane | 19 |
| Booth, Jeff | 19 |
| Carr, Pete | 19 |
| Coppock, Cameron | 19 |
| Mikol, Greg | 19 |
| Project Total: 114 |
| Project Date: | 7/23/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Jim Webb |
| Location: | Trout Creen to Sedum Ridge |
| Description: | Removed 1 6" log. Brushed 0.7 mile of salal. |
Volunteers |
Hours |
| Webb, Helen | 7 |
| Webb, Jim | 7 |
| Project Total: 14 |
| Project Date: | 7/11/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bob Arkes |
| Location: | Mt. Adams Trout Lake |
| Description: | Scouting |
Volunteers |
Hours |
| Squires, Bob | 6 |
| Project Total: 6 |
| Project Date: | 7/10/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Indian Heaven Wilderness |
| Description: | Logged out 12 trees, cleared 40 drain dips, repaired 1 root wad damage, brushed 1/2 mile of huckleberry and small fir north of Berry Mountain. |
Volunteers |
Hours |
| Booth, Jeff | 13 |
| Hawley, Bill | 13 |
| Hovin, Leif | 13 |
| Mater, James | 13 |
| Ojerio, Ryan | 13 |
| Winkel, Jeannette | 15 |
| Project Total: 80 |
| Project Date: | 7/10/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Brushing. |
Volunteers |
Hours |
| Linde, Tom | 5 |
| Ward, Norm | 5 |
| Project Total: 10 |
| Project Date: | 7/8/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bob Arkes |
| Location: | Road 23 to north of Mt. Adams Wilderness boundary |
| Description: | Logged out 7 trees, cleaned 118 drain dips, installed 5 water bars, brushed 1 mile and repaired 1/4 mile of tread between Road 23 to Road 521. |
Volunteers |
Hours |
| Arkes, Bob | 10 |
| Arkes, Jane | 10 |
| Bronstein, Bill | 10 |
| Cobb, Dave | 8 |
| Doty, Pat | 10 |
| Eastman, Erik | 8 |
| Eastman, Kathy | 8 |
| Halper, Gloria | 10 |
| Hammack, Brice | 10 |
| Moskovitz, Jay | 10 |
| Murphy, Des | 10 |
| Squires, Bob | 8 |
| Vetter, Dick | 10 |
| Vhay, John | 10 |
| Project Total: 132 |
| Project Date: | 7/8/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Jim Webb |
| Location: | Sedum Ridge to Trout Creek |
| Description: | Logged out 31 trees. Improved 5 drain dipts and 1 water bar. Brushed vine maple, devil's club and overhanging limbs. Repaired 120- yard of tread. |
Volunteers |
Hours |
| Canessa, William | 12 |
| Crouse, Bill | 12 |
| Webb, Jim | 12 |
| Project Total: 36 |
| Project Date: | 7/6/2009 to 7/10/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Big Huckleberry Mountain |
| Description: | Led Skamania County Forest Youth Success Program. Cleaned 20 drain dips. |
Volunteers |
Hours |
| Hawley, Bill | 52 |
| Project Total: 52 |
| Project Date: | 7/3/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Cedar Creek trailhead |
| Description: | Tree removal. |
Volunteers |
Hours |
| Hawley, Bill | 9 |
| Project Total: 9 |
| Project Date: | 7/2/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Kim Owen |
| Location: | Road 2000 to Sedum Ridge |
| Description: | Removed 6 logs and light brushing. Cleaned drain dips. |
Volunteers |
Hours |
| Carr, Pete | 11 |
| Nelson, David | 11 |
| Owen, Kim | 13 |
| Owen, Pam | 11 |
| Project Total: 46 |
| Project Date: | 6/26/2009 to 6/28/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Crest Camp to Indian Heaven |
| Description: | Logged out 40 trees (7: < 8", 27: 8"-24", 6: 24"-36"). Cleaned 18 drain dips. Repaired tread for two root wads. 1/4 mile of creep repair and grading. |
Volunteers |
Hours |
| Arkes, Bob | 22 |
| Booth, Jeff | 34 |
| Carr, Pete | 34 |
| Cunningham, John | 19 |
| Harrold, Ryan | 17 |
| Hawley, Bill | 34 |
| Hawley, Karla | 38 |
| Hovin, Leif | 34 |
| Mater, James | 34 |
| Mikol, Greg | 34 |
| Ojerio, Ryan | 11 |
| Webb, Jim | 20 |
| Project Total: 331 |
| Project Date: | 6/23/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Logout |
Volunteers |
Hours |
| Linde, Tom | 2 |
| Ward, Norm | 2 |
| Project Total: 4 |
| Project Date: | 6/22/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Brushing |
Volunteers |
Hours |
| Linde, Tom | 4 |
| Thompson, Frani | 3 |
| Ward, Norm | 3 |
| Project Total: 10 |
| Project Date: | 6/20/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Brushing |
Volunteers |
Hours |
| Linde, Tom | 4 |
| Thompson, Frani | 4 |
| Project Total: 8 |
| Project Date: | 6/19/2009 to 6/21/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Road 60 at Crest Camp (north and south) |
| Description: | Logged out 39 trees. Cleaned 16 drain dips north of Crest Camp. Installed 22 check steps south of Sheep Lake. Repaired damage from 1 root wad. Brushed 3/4 mi. and removed berm. |
Volunteers |
Hours |
| Artman, Alan | 20 |
| Beckwith, Bozeb | 24 |
| Cather, Robert | 23 |
| Cunningham, John | 13 |
| Davis, Vicki | 13 |
| Hawley, Bill | 41 |
| Hawley, Karla | 33 |
| Martiny, Chuck | 25 |
| Pikkola, Dane | 24 |
| Webb, Jim | 9 |
| Project Total: 225 |
| Project Date: | 6/17/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Brushing, drainage work. |
Volunteers |
Hours |
| Linde, Tom | 4 |
| Ward, Norm | 4 |
| Project Total: 8 |
| Project Date: | 6/17/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bob Arkes |
| Location: | Mount Adams Ranger Station, Trout Lake |
| Description: | Delivered tools to new cache |
Volunteers |
Hours |
| Arkes, Bob | 8 |
| Arkes, Jane | 8 |
| Project Total: 16 |
| Project Date: | 6/14/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Brushing, tread work. |
Volunteers |
Hours |
| Linde, Tom | 3 |
| Ward, Norm | 3 |
| Project Total: 6 |
| Project Date: | 6/10/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Logout |
Volunteers |
Hours |
| Johnson, Gary | 9 |
| Linde, Tom | 8 |
| Thompson, Frani | 8 |
| Project Total: 25 |
| Project Date: | 6/9/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Logout |
Volunteers |
Hours |
| Johnson, Steve | 6 |
| Linde, Tom | 6 |
| Thompson, Frani | 6 |
| Ward, Norm | 6 |
| Project Total: 24 |
| Project Date: | 6/8/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Road 68 and Cedar Creek Trail |
| Description: | Logged out 65 trees (4" - 16"). |
Volunteers |
Hours |
| Hawley, Bill | 11 |
| Martiny, Chuck | 11 |
| Project Total: 22 |
| Project Date: | 5/29/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Road 68 |
| Description: | Tree removal |
Volunteers |
Hours |
| Hawley, Bill | 6 |
| Project Total: 6 |
| Project Date: | 5/22/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Kim Owen |
| Location: | Wind River Training Center |
| Description: | Training for trainers |
Volunteers |
Hours |
| Hawley, Bill | 11 |
| Owen, Kim | 12 |
| Owen, Pam | 11 |
| Project Total: 34 |
| Project Date: | 5/13/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Scouting and brushing |
Volunteers |
Hours |
| Johnson, Gary | 5 |
| Linde, Tom | 5 |
| Thompson, Frani | 5 |
| Project Total: 15 |
| Project Date: | 5/12/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Greenleaf Creek area |
| Description: | Logged out 9 trees (5: <8", 8: 8"-24", 1: 24"=36"). Cleaned waterbars at Greenleaf Creek. Genreal brushing. Jim Proctor on site. |
Volunteers |
Hours |
| Hawley, Bill | 12 |
| Martiny, Chuck | 10 |
| Project Total: 22 |
| Project Date: | 5/10/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Road 2000 |
| Description: | Logged out 13 (8"-16) and 4 (16" - 24") with chainsaw. Logged out 5 (8" - 16") with crosscut saw. |
Volunteers |
Hours |
| Allen, Eric | 10 |
| Hawley, Bill | 13 |
| Plant, Steve | 10 |
| Project Total: 33 |
| Project Date: | 5/2/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Warren Gap |
| Description: | Logged out 47 trees <18". Trail maintenance / training hybrid. |
Volunteers |
Hours |
| Arkes, Bob | 9 |
| Beard, Dennis | 9 |
| Carter, Patty | 10 |
| Cobb, Roberta | 9 |
| Covey, Kathy | 9 |
| Crouse, Bill | 8 |
| Cunningham, John | 10 |
| Goodwin, Ron | 9 |
| Hawley, Bill | 17 |
| Konner, Jack | 10 |
| Linde, Tom | 8 |
| O'Neil, Geoff | 9 |
| Owen, Kim | 10 |
| Queen, Steve | 10 |
| Webb, Jim | 8 |
| Project Total: 145 |
| Project Date: | 4/28/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Brushing and drainage. |
Volunteers |
Hours |
| Johnson, Steve | 5 |
| Linde, Tom | 5 |
| Thompson, Frani | 5 |
| Ward, Norm | 5 |
| Project Total: 20 |
| Project Date: | 4/27/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Wind River Bridge |
| Description: | Logged out 12 trees <14". Trail maintenance / training hybrid. |
Volunteers |
Hours |
| Carr, Pete | 10 |
| Hawley, Bill | 13 |
| Linde, Tom | 6 |
| Martiny, Chuck | 10 |
| Weston, Ruth | 9 |
| Project Total: 48 |
| Project Date: | 4/17/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Brushing |
Volunteers |
Hours |
| Johnson, Steve | 3 |
| Linde, Tom | 3 |
| Project Total: 6 |
| Project Date: | 4/15/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River area |
| Description: | Brushing |
Volunteers |
Hours |
| Johnson, Steve | 3 |
| Linde, Tom | 3 |
| Project Total: 6 |
| Project Date: | 3/18/2009 |
| Agency: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Scouting |
| Description: | Scouting Wind River area |
Volunteers |
Hours |
| Johnson, Steve | 4 |
| Linde, Tom | 4 |
| Project Total: 8 |
| Project Date: | 10/28/2008 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | 3 miles south of Crest Camp |
| Description: | Cleared 30" rotten log. Cleaned and rebuilt 7 drain dips, power brushed 3/4 mile of huckleberry and vine maple near Bill Butte. |
Volunteers |
Hours |
| Carr, Pete | 8 |
| Hawley, Bill | 9 |
| Project Total: 17 |
| Project Date: | 10/10/2008 to 10/12/2008 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Berry Mountain |
| Description: | Logged out 1 tree, built or cleaned 19 drain dips, repaired 3 water bars, brushed 1.25 miles of huckleberry and small conifers, widened 800 feet of tread. |
Volunteers |
Hours |
| Carr, Pete | 22 |
| Chelin, Chuck | 21 |
| Cunningham, John | 30 |
| Doyle, Tim | 15 |
| Hawley, Bill | 45 |
| Jaroch, Eric | 22 |
| Project Total: 155 |
| Project Date: | 10/1/2008 to 10/2/2008 |
| Agency: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Indian Heaven |
| Description: | Logged 20 trees and cleaned out over 100 drain dips from road 24 to Junction Lake. |
Volunteers |
Hours |
| Hawley, Bill | 21 |
| Winkel, Jeannette | 11 |
| Project Total: 32 |