Volunteer Projects — Pacific Crest Trail Association
All Agencies
10/1/2006 to 9/30/2007
| Activity Summary |
| Administration: | 563 |
| Meeting: | 329 |
| Other: | 46 |
| Register Monitoring: | 42 |
| Scouting: | 230 |
| Signing: | 14 |
| Trail Maintenance (Feeder): | 371 |
| Trail Maintenance (Other): | 310 |
| Trail Maintenance (PCT): | 4546 |
| Training: | 216 |
| Total Volunteer Hours: | 6667 |
| Activity Detail (most recent on top) |
| Project Date: | 9/29/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Indian Heaven Wilderness |
| Description: | AmeriCorps crew. |
Volunteers |
Hours |
| Hawley, Bill | 38 |
| Project Total: 38 |
| Project Date: | 9/24/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bob Arkes |
| Location: | Williams Mine Road to Riley Creek |
| Description: | Scouting. |
Volunteers |
Hours |
| Arkes, Bob | 12 |
| Hawley, Bill | 12 |
| Project Total: 24 |
| Project Date: | 9/22/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Ruth Weston |
| Location: | Timberline Lodge to Zig Zag Canyon |
| Description: | Cleaned 24 drain dips and 6 water bars. Repaired 800' of tread. |
Volunteers |
Hours |
| Arkes, Bob | 10 |
| Arkes, Jane | 10 |
| Cobb, Roberta | 10 |
| Fong, April Ann | 10 |
| Hanes, Douglas | 10 |
| Lameka, Ann | 10 |
| Ranganathan, Nandini | 10 |
| Vhay, John | 10 |
| Weston, Ruth | 10 |
| Project Total: 90 |
| Project Date: | 9/14/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Road 60 to Junction Lake |
| Description: | Cleaned 35 drain dips, Installed 4 and cleaned 3 water bars. Brushed half mile of huckleberry. Removed berm for 250 yards. |
Volunteers |
Hours |
| Carr, Pete | 23 |
| Cunningham, John | 23 |
| Gifford, Bill | 23 |
| Hawley, Bill | 35 |
| Hawley, Karla | 34 |
| Pikkola, Dane | 23 |
| Project Total: 161 |
| Project Date: | 9/12/2007 |
| District: | N/A |
| Leader: | Steve Queen |
| Location: | Steve Queen's house |
| Description: | September caretakers meeting |
Volunteers |
Hours |
| Adams, Barb | 3 |
| Cobb, Roberta | 3 |
| Goodwin, Ron | 3 |
| Hawley, Bill | 3 |
| Konner, Jack | 3 |
| Lukins, Dick | 3 |
| Owen, Kim | 3 |
| Owen, Pam | 3 |
| Plant, Steve | 3 |
| Queen, Steve | 2 |
| Weston, Ruth | 3 |
| Project Total: 32 |
| Project Date: | 9/11/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Potato Hill to Crest Camp |
| Description: | Scouting |
Volunteers |
Hours |
| Linde, Tom | 33 |
| Project Total: 33 |
| Project Date: | 9/8/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Jack Konner |
| Location: | Pioneer Bridle Trail |
| Description: | Transported dirt and rocks to raise level of tread. |
Volunteers |
Hours |
| Bartos, Heather | 7 |
| Bartos, Jim | 7 |
| Carter, Patty | 7 |
| Cobb, Roberta | 7 |
| Goodwin, Ron | 7 |
| Hammack, Brice | 7 |
| Hanes, Douglas | 7 |
| Karlgaard, Karl | 7 |
| Konner, Jack | 7 |
| O'Neil, Geoff | 7 |
| Queen, Steve | 7 |
| Ranganathan, Nandini | 7 |
| Weston, Ruth | 7 |
| Project Total: 91 |
| Project Date: | 9/4/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Road 60 (north and south) |
| Description: | Removed misc. late season blowdown. |
Volunteers |
Hours |
| Hawley, Bill | 7 |
| Hawley, Karla | 7 |
| Project Total: 14 |
| Project Date: | 9/2/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Road 60 to Indian Heaven Wilderness boundary |
| Description: | Scouted trenching problems. |
Volunteers |
Hours |
| Hawley, Bill | 6 |
| Project Total: 6 |
| Project Date: | 9/1/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Kim Owen |
| Location: | Timberline Lodge to Ramona Falls |
| Description: | Cleaned 73 drain dips and 12 water bars. |
Volunteers |
Hours |
| Owen, Emily | 20 |
| Owen, Kim | 20 |
| Owen, Pam | 20 |
| Project Total: 60 |
| Project Date: | 8/29/2007 |
| District: | Hood River Ranger District |
| Leader: | John Vhay |
| Location: | Camp Smokey |
| Description: | Trail maintenance. |
Volunteers |
Hours |
| Carr, Pete | 12 |
| Doty, Pat | 12 |
| Murray, Michael | 12 |
| Vhay, John | 12 |
| Project Total: 48 |
| Project Date: | 8/26/2007 |
| District: | Columbia River Gorge |
| Leader: | Kim Owen |
| Location: | South boundary Hatfield Wilderness |
| Description: | Replaced Wilderness sign. |
Volunteers |
Hours |
| Owen, Kim | 7 |
| Owen, Pam | 7 |
| Project Total: 14 |
| Project Date: | 8/24/2007 |
| District: | N/A |
| Leader: | Bill Hawley |
| Location: | Bridge of the Gods |
| Description: | Building tool shed at toll booth for Dana Berthold. |
Volunteers |
Hours |
| Hawley, Bill | 9 |
| Project Total: 9 |
| Project Date: | 8/20/2007 |
| District: | Hood River Ranger District |
| Leader: | Roberta Cobb |
| Location: | Frog Lake north |
| Description: | Removed 1 tree (20") with many limbs. |
Volunteers |
Hours |
| Cobb, Roberta | 4 |
| Grimsby, Benjamin | 4 |
| Grimsby, Kelsey | 4 |
| Grimsby, Lucas | 4 |
| Grimsby, Russell | 4 |
| Project Total: 20 |
| Project Date: | 8/18/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Sedum Ridge to Rock Creek |
| Description: | Scouting |
Volunteers |
Hours |
| Linde, Tom | 8 |
| Project Total: 8 |
| Project Date: | 8/13/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Panther Creek to Crest Camp |
| Description: | Light brushing for 2.5 miles. |
Volunteers |
Hours |
| Linde, Tom | 11 |
| Project Total: 11 |
| Project Date: | 8/12/2007 |
| District: | Columbia River Gorge |
| Leader: | Eric Allen |
| Location: | Table Mountain to Carpenter's Lake trail junction |
| Description: | Llogged out 6 trees. Cleaned 25 rain dips and 5 water bars. Repired 2 washouts. Spot brusing. |
Volunteers |
Hours |
| Allen, Eric | 14 |
| Hammack, Brice | 13 |
| Hilands, Bill | 13 |
| Knight, Sue | 13 |
| Lamb, Glenn | 13 |
| Project Total: 66 |
| Project Date: | 8/11/2007 |
| District: | Columbia River Gorge |
| Leader: | Steve Queen |
| Location: | Gillette Lake south |
| Description: | Cascade Locks PCT Day. Brushed half mile with power brush cutters and hand loppers. |
Volunteers |
Hours |
| Berthold, Dana | 4 |
| Cobb, Roberta | 6 |
| Hammack, Brice | 6 |
| Martiny, Chuck | 6 |
| Queen, Steve | 6 |
| Project Total: 28 |
| Project Date: | 8/8/2007 |
| District: | N/A |
| Leader: | Steve Queen |
| Location: | Jack Konner's house |
| Description: | August caretaker meeting |
Volunteers |
Hours |
| Allen, Eric | 3 |
| Berthold, Dana | 4 |
| Cobb, Roberta | 3 |
| Hammack, Brice | 3 |
| Hawley, Bill | 3 |
| Konner, Jack | 2 |
| Lukins, Dick | 3 |
| Owen, Kim | 3 |
| Plant, Steve | 3 |
| Queen, Steve | 3 |
| Vhay, John | 3 |
| Webb, Jim | 3 |
| Wolf, Becky | 3 |
| Project Total: 39 |
| Project Date: | 8/1/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Mount Adams Ranger District |
| Description: | 2 miles of brushing and 1/4 mile of tread repair |
Volunteers |
Hours |
| Griffin, Scott | 8 |
| Linde, Tom | 7 |
| McCollum, Bob | 8 |
| Project Total: 23 |
| Project Date: | 7/29/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Kim Owen |
| Location: | Sandy River |
| Description: | Posted signs on ne PCT reroute. Guided in volunteers to worksite. Carried in 40 pounds of food to resupply AmeriCorps crew. |
Volunteers |
Hours |
| Owen, Kim | 10 |
| Owen, Pam | 10 |
| Project Total: 20 |
| Project Date: | 7/29/2007 |
| District: | Hood River Ranger District |
| Leader: | Barb Adams |
| Location: | Lolo Pass north |
| Description: | Removed 9 trees. Filled 4 holds. Fixed 1 culvert. |
Volunteers |
Hours |
| Adams, Barb | 8 |
| Adams, Dave | 8 |
| Eggleston, Mike | 8 |
| Kenny, Harold | 9 |
| Project Total: 33 |
| Project Date: | 7/27/2007 |
| District: | Clackamas River Ranger District |
| Leader: | Ernie Strahm |
| Location: | Jude Lake to Mount Jefferson Wilderness |
| Description: | Removed 17 trees, repaired 12 water bars and 80 drain dips, brushed 2 miles and repaired 4 miles of tread. Repaired 1 slide. Created 5 new log water bars. |
Volunteers |
Hours |
| Adams, Myra | 17 |
| Brush, Ann | 12 |
| Brush, Dan | 12 |
| Cuerden, Becky | 17 |
| Davidson, Leslie | 16 |
| Fisher, Jim | 24 |
| Hutchison, Cindy | 17 |
| Hutchison, Dewayne | 17 |
| Hutchison, Robin | 17 |
| Hutchison, Seth | 17 |
| Jones, Larry | 17 |
| Rivera, Carla | 8 |
| Rivera, Richard | 8 |
| Robertson, Clyde | 17 |
| Roper, David | 17 |
| Sheldon, Hal | 16 |
| Stoutt, Jeff | 17 |
| Strahm, Ernie | 25 |
| Welliver, Don | 25 |
| Project Total: 316 |
| Project Date: | 7/26/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Kim Owen |
| Location: | Sandy River |
| Description: | Removed 16 trees (5: 12"; 5: 6"). Surveyed root wad project and Sandy River rebuild. Provided food drop to AmeriCorps crew. |
Volunteers |
Hours |
| Owen, Kim | 15 |
| Owen, Pam | 15 |
| Project Total: 30 |
| Project Date: | 7/24/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Jack Konner |
| Location: | Sandy River and Muddy Fork |
| Description: | Worked with AmeriCorps crew doing 2 reroutes in Sandy River area. |
Volunteers |
Hours |
| Konner, Jack | 24 |
| Project Total: 24 |
| Project Date: | 7/21/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Jack Konner |
| Location: | Top Spur to Muddy Fork |
| Description: | Removed 30 trees (6" to 28"). Cleaned 12 drain dips and 15 water bars. Filled holes in tread. |
Volunteers |
Hours |
| Barberis, Joe | 13 |
| Bartos, Heather | 13 |
| Bartos, Jim | 13 |
| Carter, Patty | 13 |
| Goodwin, Ron | 13 |
| Konner, Jack | 13 |
| Lum, Richard | 13 |
| O'Neil, Geoff | 13 |
| Project Total: 104 |
| Project Date: | 7/20/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bob Arkes |
| Location: | Road 23 to Horseshoe Meadow |
| Description: | Removed 15 trees (8" to 10"; 20"). Cleaned 200 drain dips. Brushed from Road 23 to Williams Mine Road. Repaired about 1,000' of tread. |
Volunteers |
Hours |
| Arkes, Bob | 17 |
| Arkes, Jane | 17 |
| Cunningham, John | 17 |
| Hawley, Bill | 17 |
| Nyberg, Carl | 21 |
| Vhay, John | 17 |
| Warner, Sam | 17 |
| Webb, Jim | 15 |
| Project Total: 138 |
| Project Date: | 7/18/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Kim Owen |
| Location: | Ramona Falls area |
| Description: | Project survey for PCT re-route near Sandy River with Sara Hanson, PCTA Trail Technical Advisior. |
Volunteers |
Hours |
| Owen, Kim | 12 |
| Project Total: 12 |
| Project Date: | 7/16/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Ruth Weston |
| Location: | Timberline Lodge to Paradise Park trail junction |
| Description: | Cleaned 15 drain dips. Repaired a 12' slide in Roaring River Canyon. Brushed 800' in Zig Zag Canyon. |
Volunteers |
Hours |
| Meador, Corey | 11 |
| Weston, Ruth | 11 |
| Project Total: 22 |
| Project Date: | 7/15/2007 |
| District: | Hood River Ranger District |
| Leader: | Barb Adams |
| Location: | Indian Spring |
| Description: | Removed 26 trees (medium to 22"). |
Volunteers |
Hours |
| Adams, Barb | 22 |
| Adams, Dave | 22 |
| Eggleston, Connie | 10 |
| Eggleston, Mike | 10 |
| Kenny, Harold | 22 |
| Project Total: 86 |
| Project Date: | 7/14/2007 |
| District: | Clackamas River Ranger District |
| Leader: | Becky Wolf |
| Location: | Road 4245 |
| Description: | Logged out 4 trees (35", 26", 20", 16"). |
Volunteers |
Hours |
| Reimers, Wes | 8 |
| Roe, David | 8 |
| Wolf, Becky | 8 |
| Project Total: 24 |
| Project Date: | 7/11/2007 |
| District: | N/A |
| Leader: | Steve Queen |
| Location: | Kim and Pam Owen's house |
| Description: | July caretaker meeting. |
Volunteers |
Hours |
| Allen, Eric | 3 |
| Arkes, Bob | 3 |
| Cobb, Roberta | 3 |
| Goodwin, Ron | 3 |
| Hammack, Brice | 3 |
| Konner, Jack | 3 |
| Lukins, Dick | 3 |
| McLaughlin, Larry | 3 |
| Owen, Kim | 2 |
| Owen, Pam | 2 |
| Plant, Steve | 3 |
| Vhay, John | 3 |
| Walker, Richard | 3 |
| Weston, Ruth | 3 |
| Project Total: 40 |
| Project Date: | 7/10/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Panther Crek to Crest Camp |
| Description: | Light brusing for 2 miles |
Volunteers |
Hours |
| Linde, Tom | 8 |
| Project Total: 8 |
| Project Date: | 7/7/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Kim Owen |
| Location: | Ramona Falls to Paradise Park Trail Junction |
| Description: | Cleared 60 trees. Brushed 100 yards, pole sawing, repaired washout. |
Volunteers |
Hours |
| Cobb, Roberta | 22 |
| Coleman, Liz | 24 |
| Guzie, Andy | 22 |
| Kirchmiller, Christie | 22 |
| Kirchmiller, Robert | 22 |
| McFeely, Brian | 22 |
| Owen, Kim | 22 |
| Owen, Pam | 22 |
| Panter, Henry | 23 |
| Riley, Dave | 22 |
| Tausch, Warren | 22 |
| Project Total: 245 |
| Project Date: | 7/6/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River work center |
| Description: | Tool cache maintenance |
Volunteers |
Hours |
| Linde, Tom | 4 |
| Project Total: 4 |
| Project Date: | 7/6/2007 |
| District: | Clackamas River Ranger District |
| Leader: | Becky Wolf |
| Location: | PCT feeder trails near Olallie Lake |
| Description: | Removed 33 logs (6" to 20"). Huckleberry brushing. |
Volunteers |
Hours |
| Boeckman, A | 13 |
| Boeckman, Renee | 13 |
| Carlson, Patty | 21 |
| Harrington, Sandy | 21 |
| Hunt, Donna | 21 |
| Patterson, Bob | 21 |
| Stockman, Bonnie | 9 |
| Turner, Linda | 13 |
| Warren, Jack | 21 |
| Project Total: 153 |
| Project Date: | 7/6/2007 |
| District: | Clackamas River Ranger District |
| Leader: | Becky Wolf |
| Location: | Joe Graham Horse Camp to Jude Lake |
| Description: | Removed 29 trees (16: 12" to 14"; 10: 14" to 29"; 3: >30"). |
Volunteers |
Hours |
| Levy, Kathy | 21 |
| Whitmyer, Dennis | 21 |
| Project Total: 42 |
| Project Date: | 7/6/2007 |
| District: | Clackamas River Ranger District |
| Leader: | Becky Wolf |
| Location: | Joe Graham Horse Camp to Pinhead Butttes |
| Description: | Removed 124 trees (4" to 24"). Cleaned 83 drain dips. Repaired 1 root wad. Light brushing. |
Volunteers |
Hours |
| DeVall, Dolores | 18 |
| DeVall, Marty | 18 |
| Hunt, Bob | 19 |
| Hunt, Pat | 19 |
| Sischo, Gary | 17 |
| Sischo, Peg | 17 |
| Wolf, Becky | 20 |
| Project Total: 128 |
| Project Date: | 6/30/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Ruth Weston |
| Location: | Timberline Lodge to Paradise Park Loop |
| Description: | Removed 12 trees (6" to 24"). Cleaned 24 drain dips and 2 water bars. Filled 5 holes. |
Volunteers |
Hours |
| Corwin, Susan | 9 |
| Schomburg, Dan | 18 |
| Traeger, Jennifer | 18 |
| Van Gundy, Jackie | 18 |
| Weston, Ruth | 18 |
| Project Total: 81 |
| Project Date: | 6/30/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Ron Goodwin |
| Location: | Timberline Lodge to Barlow Pass |
| Description: | Removed 51 trees (14: 4"-7", 22: 8"-13", 12: 14"-20", 3: 21"+). Repaired 15 drain dips and 45 water bars. Brushed 400' huckleberry and vine maple, Repaired 38' of tread. Rebuild 2 cairns and placed 2 4"x4"x4' posts in them.Swept with garden rake 3 miles of trail to remove branches. |
Volunteers |
Hours |
| Alway, Tom | 10 |
| Gabriel, Michael | 10 |
| Goodwin, Katie | 9 |
| Goodwin, Ron | 9 |
| Hanes, Douglas | 10 |
| Irwin, Mark | 10 |
| Kellogg, Liz | 10 |
| Martiny, Chuck | 10 |
| Pronger, Kamra | 10 |
| Ranganathan, Nandini | 10 |
| Settlemeyer, Lois | 10 |
| Walker, Richard | 10 |
| Zazilha, Magdalena | 10 |
| Project Total: 128 |
| Project Date: | 6/29/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Administration |
| Description: | Grant writing |
Volunteers |
Hours |
| Linde, Tom | 5 |
| Project Total: 5 |
| Project Date: | 6/28/2007 |
| District: | N/A |
| Leader: | Bill Hawley |
| Location: | Bridge of the Gods |
| Description: | Building tool shed at toll booth for Dana Berthold. |
Volunteers |
Hours |
| Hawley, Bill | 11 |
| Mikol, Greg | 10 |
| Project Total: 21 |
| Project Date: | 6/25/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Road 60 to Junction Lake |
| Description: | Removed 29 trees (2: 20" to 24"; 8: 10" to 20"; 19: <10"). Cleaned 13 drain dips. Repaired 1 root wad. Wilderness sign repaired, but needs replacement. |
Volunteers |
Hours |
| Arkes, Bob | 13 |
| Brown, Edwin | 16 |
| Hawley, Bill | 18 |
| Lameka, Ann | 10 |
| Mikol, Greg | 11 |
| Nyberg, Carl | 13 |
| Squires, Bob | 10 |
| Weston, Ruth | 11 |
| Winkel, Jeannette | 16 |
| Project Total: 118 |
| Project Date: | 6/23/2007 |
| District: | Hood River Ranger District |
| Leader: | Jack Konner |
| Location: | Top Spur to Lolo Pass |
| Description: | Removed over 40 trees (1' to 3'). Cleaned 12 drain dips. Light brushing and spot tread repair over a mile. |
Volunteers |
Hours |
| Arkes, Bob | 12 |
| Arkes, Jane | 12 |
| Carter, Patty | 12 |
| Doty, Pat | 12 |
| Gabriel, Michael | 12 |
| Goodwin, Katie | 12 |
| Goodwin, Ron | 12 |
| Hammack, Brice | 12 |
| Hanes, Douglas | 12 |
| Hovin, Leif | 12 |
| Kliewer, Dave | 12 |
| Konner, Jack | 12 |
| Martiny, Chuck | 12 |
| O'Neil, Geoff | 12 |
| Ranganathan, Nandini | 12 |
| Project Total: 180 |
| Project Date: | 6/20/2007 |
| District: | N/A |
| Leader: | Bill Hawley |
| Location: | Bridge of the Gods |
| Description: | Building tool shed at toll booth for Dana Berthold. |
Volunteers |
Hours |
| Hawley, Bill | 12 |
| Project Total: 12 |
| Project Date: | 6/20/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Panther Creek to Crest Camp |
| Description: | 4 miles of heavy brushing. Repaired 40 drain dips |
Volunteers |
Hours |
| Johnson, Gary | 10 |
| Johnson, Steve | 10 |
| Linde, Tom | 10 |
| Zyoloi, Babe | 10 |
| Project Total: 40 |
| Project Date: | 6/17/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | East Crater Trail 48 |
| Description: | Scouting. |
Volunteers |
Hours |
| Hawley, Bill | 3 |
| Project Total: 3 |
| Project Date: | 6/17/2007 |
| District: | Clackamas River Ranger District |
| Leader: | David Roe |
| Location: | Clackamas Lake |
| Description: | Removed 125 trees. |
Volunteers |
Hours |
| DeVall, Dolores | 10 |
| DeVall, Marty | 10 |
| Roe, David | 11 |
| Project Total: 31 |
| Project Date: | 6/16/2007 |
| District: | Hood River Ranger District |
| Leader: | Barb Adams |
| Location: | Lolo Pass north |
| Description: | Logged out and cleaned drainage dips for first five miles. |
Volunteers |
Hours |
| Adams, Barb | 9 |
| Adams, Dave | 10 |
| Davidson, Debbi | 4 |
| Eggleston, Connie | 9 |
| Eggleston, Mike | 10 |
| Kenny, Harold | 10 |
| Kliewer, Dave | 8 |
| Nelson, Brian | 8 |
| Nelson, Heather | 8 |
| Reed, Marge | 6 |
| Tucker, Deniece | 10 |
| Project Total: 92 |
| Project Date: | 6/14/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Ron Goodwin |
| Location: | Timberline Lodge to Barlow Pass |
| Description: | Removed 5 trees (3" to 4"). Cleaned 4 drain dips. Brushed 25' of trails. Repaired 20' of tread. Raked 100' of branches. Trimmed branches off 20 trees to open corridor. |
Volunteers |
Hours |
| Goodwin, Katie | 9 |
| Goodwin, Ron | 9 |
| Project Total: 18 |
| Project Date: | 6/14/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | FS 423 to White Salmon River |
| Description: | Removed 7 trees. Removed trail debris. |
Volunteers |
Hours |
| Arkes, Bob | 9 |
| Hawley, Bill | 9 |
| Project Total: 18 |
| Project Date: | 6/13/2007 |
| District: | N/A |
| Leader: | Steve Queen |
| Location: | John Vhay's house |
| Description: | June Caretaker Meeting |
Volunteers |
Hours |
| Allen, Eric | 3 |
| Arkes, Bob | 3 |
| Berthold, Dana | 4 |
| Cobb, Roberta | 3 |
| Goodwin, Ron | 3 |
| Hammack, Brice | 3 |
| Hawley, Bill | 3 |
| Konner, Jack | 3 |
| McLaughlin, Larry | 3 |
| Plant, Steve | 3 |
| Queen, Steve | 3 |
| Vhay, John | 2 |
| Walker, Richard | 3 |
| Weston, Ruth | 3 |
| Wolf, Becky | 3 |
| Project Total: 45 |
| Project Date: | 6/13/2007 |
| District: | Columbia River Gorge |
| Leader: | Eric Allen |
| Location: | Three Corner Rock south |
| Description: | Logged out 15 trees (12" to 18"). Cleaned 60 drain dips. Repaired 1 root wad. Light brushing and tread repair. |
Volunteers |
Hours |
| Allen, Eric | 12 |
| Doty, Pat | 11 |
| Hammack, Brice | 11 |
| Johnson, Wendy | 11 |
| Martiny, Chuck | 11 |
| McLaughlin, Larry | 11 |
| Vetter, Dick | 11 |
| Project Total: 78 |
| Project Date: | 6/12/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Road 60 into Indian Heaven Wildernes |
| Description: | Scouting |
Volunteers |
Hours |
| Hawley, Bill | 5 |
| Project Total: 5 |
| Project Date: | 6/12/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Jack Konner |
| Location: | Top Spur to Ramona Falls |
| Description: | Scouting. |
Volunteers |
Hours |
| Konner, Jack | 16 |
| Owen, Kim | 16 |
| Project Total: 32 |
| Project Date: | 6/10/2007 |
| District: | Hood River Ranger District |
| Leader: | Roberta Cobb |
| Location: | Barlow Pass to Frog Lake |
| Description: | Removed 22 trees. Repaired 10 drain dips. Light brushing and tread repair. |
Volunteers |
Hours |
| Artman, Alan | 9 |
| Cobb, Roberta | 9 |
| Corwin, Susan | 9 |
| Guzie, Andy | 9 |
| Hanes, Douglas | 9 |
| Hawley, Bill | 9 |
| Karlgaard, Karl | 9 |
| Kirchmiller, Christie | 9 |
| Kirchmiller, Robert | 9 |
| Ranganathan, Nandini | 9 |
| Squires, Bob | 9 |
| Tyler, Kerri | 9 |
| Winkler, Dan | 9 |
| Project Total: 117 |
| Project Date: | 6/9/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Steve Plant |
| Location: | Wapinitia Pass to Little Crater Lake |
| Description: | Removed 30 trees, repaired 7 drain dips, 3 water bars and 2 root wads. General brushing. |
Volunteers |
Hours |
| Creelman, Kevin | 12 |
| Luyan, Melissa | 12 |
| Marcus, Gerrett | 12 |
| Peterson, John | 12 |
| Plant, Steve | 12 |
| Price, Tracy | 12 |
| Project Total: 72 |
| Project Date: | 6/9/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Jim Webb |
| Location: | Trout Creek to Sedum Ridge |
| Description: | General trail maintenance. |
Volunteers |
Hours |
| Gray, Frank | 8 |
| Webb, Jim | 8 |
| Zschomler, Arvol | 7 |
| Project Total: 23 |
| Project Date: | 6/8/2007 |
| District: | Columbia River Gorge |
| Leader: | Chuck Martiny |
| Location: | Bridge of the Gods to Fort Rains |
| Description: | Removed 1 4" tree. Brushed length of section of blackberries and poison oak. |
Volunteers |
Hours |
| Martiny, Chuck | 6 |
| Mikol, Greg | 6 |
| Mikol, Joanne | 6 |
| Nelson, David | 6 |
| Project Total: 24 |
| Project Date: | 6/7/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Sedum Point |
| Description: | Removed two 24" trees. |
Volunteers |
Hours |
| Hutton, Warren | 6 |
| Linde, Tom | 6 |
| Project Total: 12 |
| Project Date: | 6/6/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bob Arkes |
| Location: | Road 23 to White Salmon River |
| Description: | Scouting |
Volunteers |
Hours |
| Arkes, Bob | 9 |
| Arkes, Jane | 9 |
| Project Total: 18 |
| Project Date: | 6/4/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Ruth Weston |
| Location: | Timberline Lodge to Little Zig Zag Canyon |
| Description: | Scouting |
Volunteers |
Hours |
| Weston, Ruth | 4 |
| Project Total: 4 |
| Project Date: | 6/2/2007 |
| District: | Columbia River Gorge |
| Leader: | Roberta Cobb |
| Location: | Multnomah Falls |
| Description: | Manned info booth, setting new rail fence, replaced wooden posts and chain fence . |
Volunteers |
Hours |
| Cobb, Roberta | 8 |
| Goodwin, Katie | 8 |
| Goodwin, Ron | 8 |
| Owen, Kim | 7 |
| Vetter, Dick | 8 |
| Project Total: 39 |
| Project Date: | 6/2/2007 |
| District: | N/A |
| Leader: | Steve Queen |
| Location: | Hopewell House |
| Description: | Wilderness First Aid Training |
Volunteers |
Hours |
| Arkes, Bob | 8 |
| Berthold, Dana | 8 |
| Hawley, Bill | 8 |
| Martiny, Chuck | 8 |
| Plant, Steve | 8 |
| Queen, Steve | 8 |
| Webb, Jim | 8 |
| Weston, Ruth | 8 |
| Project Total: 64 |
| Project Date: | 5/31/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Bill Hawley |
| Location: | Crest Camp to Sheep Lake |
| Description: | Removed 8 trees (3: 16-20"; 5: <12"). Cleaned drain dip and water bars. |
Volunteers |
Hours |
| Arkes, Bob | 8 |
| Cobb, Roberta | 8 |
| Hawley, Bill | 8 |
| Project Total: 24 |
| Project Date: | 5/30/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Richard Walker |
| Location: | Little Crater Lake to Road 42 |
| Description: | Removed 41 trees. Repaired drain dips and water bars. Brushed. |
Volunteers |
Hours |
| Hammack, Brice | 9 |
| McLaughlin, Larry | 9 |
| Murphy, Des | 9 |
| Vetter, Dick | 9 |
| Walker, Ford | 12 |
| Walker, Penny | 12 |
| Walker, Richard | 20 |
| Project Total: 80 |
| Project Date: | 5/26/2007 |
| District: | Hood River Ranger District |
| Leader: | John Vhay |
| Location: | Wahtum Lake |
| Description: | Trail maintenance. |
Volunteers |
Hours |
| Barberis, Joe | 10 |
| Bartos, Heather | 10 |
| Bartos, Jim | 10 |
| Carr, Pete | 10 |
| Fong, April Ann | 10 |
| Karlgaard, Karl | 10 |
| Nyberg, Carl | 12 |
| Pikkola, Dane | 10 |
| Stevenson, John | 10 |
| Vhay, John | 11 |
| Project Total: 103 |
| Project Date: | 5/25/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Larry McLaughlin |
| Location: | Road 2070 to Sedum Ridge |
| Description: | Removed 48 trees (1 40", 8 20"-12", 39 <12"). Repaired drain dips, water bars and 1 slide. Spot brushing and tread repair. Repaired 2 root wad damage. |
Volunteers |
Hours |
| Hammack, Brice | 14 |
| Martiny, Chuck | 14 |
| McLaughlin, Larry | 14 |
| Project Total: 42 |
| Project Date: | 5/25/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Indian Heaven |
| Description: | Scouting |
Volunteers |
Hours |
| Linde, Tom | 13 |
| Project Total: 13 |
| Project Date: | 5/23/2007 |
| District: | Columbia River Gorge |
| Leader: | Larry McLaughlin |
| Location: | Three Corner Rock to Road 2070 |
| Description: | Removed 11 trees (1 26", 2 18"-12", 8 <12"). Repaired drain dips, water bars and 1 slide. Spot brushing and tread repair. |
Volunteers |
Hours |
| Alway, Tom | 9 |
| Doty, Pat | 10 |
| Hammack, Brice | 10 |
| Hawley, Bill | 10 |
| McLaughlin, Larry | 10 |
| Vetter, Dick | 10 |
| Walker, Ford | 10 |
| Walker, Richard | 10 |
| Walker, Robert | 10 |
| Project Total: 89 |
| Project Date: | 5/20/2007 |
| District: | Hood River Ranger District |
| Leader: | John Vhay |
| Location: | Wahtum Lake north and south |
| Description: | Scouting |
Volunteers |
Hours |
| Doty, Pat | 9 |
| Vhay, John | 9 |
| Project Total: 18 |
| Project Date: | 5/16/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Kim Owen |
| Location: | Ramona Falls area |
| Description: | Removed 6 logs. Repaired 1 root wad. Scouting for future project. |
Volunteers |
Hours |
| Owen, Kim | 13 |
| Project Total: 13 |
| Project Date: | 5/16/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Panther Creek to Crest Camp |
| Description: | Removed 16 logs (8" to 30") |
Volunteers |
Hours |
| Johnson, Gary | 10 |
| Linde, Tom | 10 |
| Project Total: 20 |
| Project Date: | 5/13/2007 |
| District: | Hood River Ranger District |
| Leader: | Roberta Cobb |
| Location: | Frog Lake north |
| Description: | Removed 17 trees (2 24", 15 12"-14"). Cleaned 3 drain dips. |
Volunteers |
Hours |
| Cobb, Roberta | 10 |
| Koppy, Lawrence | 10 |
| Towill, Elizabeth | 10 |
| Project Total: 30 |
| Project Date: | 5/11/2007 |
| District: | Columbia River Gorge |
| Leader: | Ron Goodwin |
| Location: | East of Dry Creek |
| Description: | Removed 1 27" tree. |
Volunteers |
Hours |
| Goodwin, Katie | 5 |
| Goodwin, Ron | 5 |
| Martiny, Chuck | 7 |
| Project Total: 17 |
| Project Date: | 5/10/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Jim Webb |
| Location: | Trout Creek to Sedum Ridge |
| Description: | General trail maintenance. |
Volunteers |
Hours |
| Mooney, John | 11 |
| Webb, Jim | 11 |
| Project Total: 22 |
| Project Date: | 5/9/2007 |
| District: | Columbia River Gorge |
| Leader: | Brice Hammack |
| Location: | Carpenters Lake trail junction to Sedum Ridge |
| Description: | Scouting |
Volunteers |
Hours |
| Hammack, Brice | 32 |
| Project Total: 32 |
| Project Date: | 5/9/2007 |
| District: | N/A |
| Leader: | Steve Queen |
| Location: | Jack Konner's House |
| Description: | April Caretaker Meeting |
Volunteers |
Hours |
| Allen, Eric | 3 |
| Berthold, Dana | 4 |
| Cobb, Roberta | 3 |
| Goodwin, Ron | 3 |
| Hawley, Bill | 3 |
| Konner, Jack | 2 |
| McLaughlin, Larry | 3 |
| Owen, Kim | 3 |
| Queen, Steve | 3 |
| Vhay, John | 3 |
| Weston, Ruth | 3 |
| Wolf, Becky | 3 |
| Project Total: 36 |
| Project Date: | 5/8/2007 |
| District: | Columbia River Gorge |
| Leader: | Roberta Cobb |
| Location: | Herman Creek |
| Description: | Chainsaw training |
Volunteers |
Hours |
| Cobb, Roberta | 8 |
| Project Total: 8 |
| Project Date: | 4/29/2007 |
| District: | Hood River Ranger District |
| Leader: | Roberta Cobb |
| Location: | Frog Lake north |
| Description: | Removed 10 trees. |
Volunteers |
Hours |
| Brown, Gary | 7 |
| Brown, Maureen | 7 |
| Cobb, Roberta | 7 |
| Koppy, Lawrence | 7 |
| Towill, Elizabeth | 7 |
| Weston, Ruth | 7 |
| Project Total: 42 |
| Project Date: | 4/24/2007 |
| District: | N/A |
| Leader: | Steve Queen |
| Location: | Steve Queen's House |
| Description: | Meet and Greet with Dana Berthold |
Volunteers |
Hours |
| Berthold, Dana | 4 |
| Dawson, Mike | 4 |
| Hammack, Brice | 3 |
| Lukins, Dick | 3 |
| McLaughlin, Larry | 3 |
| Owen, Kim | 3 |
| Owen, Pam | 3 |
| Queen, Steve | 2 |
| Walker, Richard | 3 |
| Weston, Ruth | 3 |
| Project Total: 31 |
| Project Date: | 4/24/2007 |
| District: | Clackamas River Ranger District |
| Leader: | Steve Queen |
| Location: | Chainsaw Certification (Estacada Ranger Station) |
| Description: | 5 volunteers participated in a chainsaw re-certification course at the Estacad Ranger Station. |
Volunteers |
Hours |
| Adams, Barb | 8 |
| Arkes, Bob | 8 |
| Owen, Kim | 8 |
| Plant, Steve | 8 |
| Vhay, John | 8 |
| Weston, Ruth | 8 |
| Project Total: 48 |
| Project Date: | 4/23/2007 |
| District: | Columbia River Gorge |
| Leader: | Tom Linde |
| Location: | Cascade Locks |
| Description: | Attended Recreational Site Facilities Master Plan. |
Volunteers |
Hours |
| Linde, Tom | 3 |
| Project Total: 3 |
| Project Date: | 4/20/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Brice Hammack |
| Location: | Panther Creek to Trout Creek |
| Description: | Removed 49 trees, cleaned drainage dips and brushed. Moved tools into the Wind River Work Center shop. Checked out on USFS radios. |
Volunteers |
Hours |
| Arkes, Bob | 10 |
| Hammack, Brice | 10 |
| Hawley, Bill | 10 |
| McLaughlin, Larry | 10 |
| Webb, Jim | 9 |
| Project Total: 49 |
| Project Date: | 4/14/2007 |
| District: | Columbia River Gorge |
| Leader: | Steve Queen |
| Location: | Carpenters Lake Trail north |
| Description: | Removed 12 threes (2 18", 10 6"-8"). Repaired 600' of tread. Made trail passable to gigantic root wad. |
Volunteers |
Hours |
| Beard, Dennis | 9 |
| Carpenter, Roger | 9 |
| Dolinar, Brian | 9 |
| Gifford, Bill | 9 |
| Marriott, Tyler | 9 |
| Queen, Steve | 9 |
| Spangler, David | 9 |
| Vhay, John | 9 |
| Wallis, Kelly | 9 |
| Warner, Sam | 9 |
| Project Total: 90 |
| Project Date: | 4/13/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Kim Owen |
| Location: | Ramona Falls feeder and PCT |
| Description: | Assessed winter damage. |
Volunteers |
Hours |
| Nelson, David | 10 |
| Owen, Kim | 10 |
| Owen, Pam | 10 |
| Project Total: 30 |
| Project Date: | 4/11/2007 |
| District: | N/A |
| Leader: | Steve Queen |
| Location: | Brice Hammack's House |
| Description: | April Caretaker meeting |
Volunteers |
Hours |
| Allen, Eric | 3 |
| Arkes, Bob | 3 |
| Cobb, Roberta | 3 |
| Goodwin, Ron | 3 |
| Hammack, Brice | 2 |
| Hawley, Bill | 3 |
| Konner, Jack | 3 |
| Lukins, Dick | 3 |
| McLaughlin, Larry | 3 |
| Owen, Kim | 3 |
| Owen, Pam | 3 |
| Queen, Steve | 3 |
| Vhay, John | 3 |
| Walker, Richard | 3 |
| Webb, Jim | 4 |
| Weston, Ruth | 3 |
| Project Total: 48 |
| Project Date: | 4/11/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Jack Konner |
| Location: | Trail #19 |
| Description: | Removed 6 trees (1' to 2'). Repaird 20 yards of tread. |
Volunteers |
Hours |
| Corwin, Susan | 7 |
| Konner, Jack | 5 |
| Project Total: 12 |
| Project Date: | 4/11/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Jim Webb |
| Location: | Trout Creek to Sedum Ridge |
| Description: | General trail maintenance. |
Volunteers |
Hours |
| Webb, Jim | 7 |
| Project Total: 7 |
| Project Date: | 4/7/2007 |
| District: | Columbia River Gorge |
| Leader: | Steve Queen |
| Location: | Bridge of the Gods to Hatfield Wilderness Boundary |
| Description: | Removed 17 threes (5 16", 3 18", 9 6"-8"). Repaired 600' of tread. Worked up to Teakettle Spring. |
Volunteers |
Hours |
| Arkes, Bob | 9 |
| Budnick, Debi | 9 |
| Dolinar, Brian | 9 |
| Erwin, Mark | 9 |
| Goodwin, Katie | 9 |
| Goodwin, Ron | 9 |
| Hawley, Bill | 9 |
| Janoch, Larry | 9 |
| Nash, Maureen | 9 |
| Nyberg, Carl | 11 |
| Perretta, Anne | 9 |
| Phillips, Matthew | 9 |
| Queen, Steve | 9 |
| Warner, Sam | 9 |
| Project Total: 128 |
| Project Date: | 4/6/2007 |
| District: | Columbia River Gorge |
| Leader: | Roberta Cobb |
| Location: | Wahkeena Trail |
| Description: | Removed bridge. Repaired quarter mile of trail. |
Volunteers |
Hours |
| Cobb, Roberta | 8 |
| Hawley, Bill | 8 |
| Matson, Al | 8 |
| Murray, Michael | 8 |
| Pikkola, Dane | 8 |
| Vetter, Dick | 8 |
| Winkler, Dan | 8 |
| Project Total: 56 |
| Project Date: | 3/31/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Chainsaw Certification (Wind River Work Center) |
| Description: | 13 volunteers participated in a chainsaw re-certification course at the Wind River Work Center. |
Volunteers |
Hours |
| Carter, Patty | 7 |
| Cobb, Roberta | 7 |
| Doty, Pat | 7 |
| Goodwin, Ron | 7 |
| Hammack, Brice | 7 |
| Hawley, Bill | 7 |
| Konner, Jack | 7 |
| Linde, Tom | 7 |
| Martiny, Chuck | 7 |
| McLaughlin, Larry | 7 |
| O'Neil, Geoff | 7 |
| Walker, Richard | 7 |
| Webb, Jim | 7 |
| Project Total: 91 |
| Project Date: | 3/30/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River Work Center |
| Description: | Set up for saw training and worked on tool storage area. |
Volunteers |
Hours |
| Linde, Tom | 4 |
| Project Total: 4 |
| Project Date: | 3/25/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Jack Konner |
| Location: | Old Salmon River Trail |
| Description: | Removed 14 trees and 2 rood wads. Repaired 100' of tread. Repaired 5 drain dips. Repaired bridge approaches and stairs. Cleared mud and rocks over and under bridge. Blocked off unused trail. Removed debris. Removed fire ring. Improved stream crossing. |
Volunteers |
Hours |
| Carr, Pete | 11 |
| Carter, Patty | 11 |
| Corwin, Susan | 9 |
| Gifford, Bill | 10 |
| Konner, Jack | 12 |
| O'Neil, Geoff | 11 |
| Roe, David | 10 |
| Stevenson, John | 11 |
| Turner, Tammy | 11 |
| Wankowicz, Bex | 9 |
| Project Total: 105 |
| Project Date: | 3/21/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Wind River Work Center |
| Description: | Scouting trip for saw class |
Volunteers |
Hours |
| Linde, Tom | 5 |
| Project Total: 5 |
| Project Date: | 3/21/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Jack Konner |
| Location: | Old Salmon River Trail |
| Description: | Measured risers and analyzed stair structure for repair to be done on 3/25/07 |
Volunteers |
Hours |
| Konner, Jack | 7 |
| Project Total: 7 |
| Project Date: | 3/14/2007 |
| District: | N/A |
| Leader: | Steve Queen |
| Location: | Steve Queen's House |
| Description: | March Caretaker meeting |
Volunteers |
Hours |
| Allen, Eric | 3 |
| Arkes, Bob | 3 |
| Cobb, Roberta | 3 |
| Goodwin, Ron | 3 |
| Hammack, Brice | 3 |
| Hawley, Bill | 3 |
| Konner, Jack | 3 |
| McLaughlin, Larry | 3 |
| Owen, Pam | 3 |
| Plant, Steve | 3 |
| Queen, Steve | 2 |
| Weston, Ruth | 3 |
| Wolf, Becky | 3 |
| Project Total: 38 |
| Project Date: | 3/10/2007 |
| District: | N/A |
| Leader: | Steve Queen |
| Location: | Mount Hood Supervisors Office |
| Description: | Meeting to start new volunteer agreement revisions. |
Volunteers |
Hours |
| Adams, Barb | 4 |
| Kenny, Harold | 4 |
| Queen, Steve | 5 |
| Roe, David | 4 |
| Project Total: 17 |
| Project Date: | 3/8/2007 |
| District: | Columbia River Gorge |
| Leader: | Kim Owen |
| Location: | Gillette Lake to Carpenters Lake trail |
| Description: | Removed 21 trees (17 4"-10", 4 12"-16"). |
Volunteers |
Hours |
| Owen, Kim | 10 |
| Owen, Pam | 10 |
| Project Total: 20 |
| Project Date: | 3/7/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Jack Konner |
| Location: | Old Salmon River Trail |
| Description: | Scouting |
Volunteers |
Hours |
| Konner, Jack | 8 |
| Project Total: 8 |
| Project Date: | 3/6/2007 |
| District: | Zig Zag Ranger District |
| Leader: | Jack Konner |
| Location: | Old Salmon River Trail |
| Description: | Scouting |
Volunteers |
Hours |
| Konner, Jack | 7 |
| Project Total: 7 |
| Project Date: | 2/22/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | Panther Creek to Road 68 |
| Description: | Scouting |
Volunteers |
Hours |
| Linde, Tom | 7 |
| Project Total: 7 |
| Project Date: | 2/10/2007 |
| District: | Columbia River Gorge |
| Leader: | Roberta Cobb |
| Location: | Eagle Creek Trail |
| Description: | Built new trail over old use trail. Improved offical trail. Obliterated other side trails. Fixed small slide/shortcut by building rock wall and installing curb log. Rehabed damaged area at viewpoint by laying down mulch cloth and planing ferrns, etc. Installed new signage. |
Volunteers |
Hours |
| Beard, Dennis | 8 |
| Buhl, Laura | 8 |
| Carr, Pete | 8 |
| Chelin, Chuck | 8 |
| Cobb, Roberta | 8 |
| Kirchmiller, Christie | 8 |
| Kirchmiller, Robert | 8 |
| Lee, Jason | 8 |
| Medina, Pablo | 8 |
| Till, Richard | 8 |
| Vetter, Dick | 8 |
| Weston, Ruth | 8 |
| Project Total: 96 |
| Project Date: | 2/9/2007 |
| District: | Mount Adams Ranger District |
| Leader: | Jim Webb |
| Location: | Trout Creek to Sedum Ridge |
| Description: | General trail maintenance. |
Volunteers |
Hours |
| Webb, Jim | 8 |
| Project Total: 8 |
| Project Date: | 1/29/2007 |
| District: | Columbia River Gorge |
| Leader: | Roberta Cobb |
| Location: | Eagle Creek Trail |
| Description: | Removed 2 trees and 1 huge boulder by using a come-a-long. |
Volunteers |
Hours |
| Cobb, Roberta | 9 |
| Weston, Ruth | 9 |
| Project Total: 18 |
| Project Date: | 1/6/2007 |
| District: | Columbia River Gorge |
| Leader: | Roberta Cobb |
| Location: | Eagle Creek Trail |
| Description: | Removed 7 large trees. Repaired 4 slides. Removed 1 root wad. Installed gabion a the root wad damage. |
Volunteers |
Hours |
| Burdich, Paul | 8 |
| Carr, Pete | 8 |
| Chelin, Chuck | 8 |
| Cobb, Dave | 8 |
| Cobb, Roberta | 8 |
| Doty, Pat | 8 |
| Hammack, Brice | 8 |
| Hawley, Doug | 8 |
| McLaughlin, Larry | 8 |
| Smith, Ron | 8 |
| Sohler, Don | 8 |
| Vhay, John | 8 |
| Winkler, Dan | 8 |
| Project Total: 104 |
| Project Date: | 1/1/2007 |
| District: | N/A |
| Leader: | Jack Konner |
| Location: | Register Monitoring |
| Description: | Register monitoring hours. |
Volunteers |
Hours |
| Konner, Jack | 14 |
| Matzke, Jim | 14 |
| Matzke, Liz | 14 |
| Project Total: 42 |
| Project Date: | 1/1/2007 |
| District: | N/A |
| Leader: | Steve Queen |
| Location: | Administration |
| Description: | Administrative hours. |
Volunteers |
Hours |
| Cobb, Roberta | 8 |
| Hammack, Brice | 13 |
| Konner, Jack | 300 |
| Owen, Kim | 78 |
| Queen, Steve | 150 |
| Vhay, John | 1 |
| Webb, Jim | 6 |
| Weston, Ruth | 2 |
| Project Total: 558 |
| Project Date: | 12/17/2006 |
| District: | Columbia River Gorge |
| Leader: | Roberta Cobb |
| Location: | Eagle Creek Trail |
| Description: | 16 logs removed, 4 slides repaired, 1 large root wad pulled off trail and cleaned bridge and ditches. Prepped for Gabion installation. |
Volunteers |
Hours |
| Cobb, Roberta | 10 |
| Goodwin, Ron | 10 |
| Kirchmiller, Christie | 11 |
| Kirchmiller, Robert | 11 |
| Merrifield, John | 10 |
| Vetter, Dick | 10 |
| Weston, Ruth | 10 |
| Project Total: 72 |
| Project Date: | 12/10/2006 |
| District: | Columbia River Gorge |
| Leader: | Steve Queen |
| Location: | Bridge of the Gods to Herman Creek Trail junction |
| Description: | Logged out trees from November rain and wind storms and cleaned drain dips. |
Volunteers |
Hours |
| Hammack, Brice | 9 |
| Martiny, Chuck | 9 |
| McLaughlin, Larry | 9 |
| Queen, Steve | 9 |
| Project Total: 36 |
| Project Date: | 10/25/2006 |
| District: | Zig Zag Ranger District |
| Leader: | Jack Konner |
| Location: | Sandy River Trail #770 |
| Description: | Seasonal removal and storage of temporary bridge over the Sandy River |
Volunteers |
Hours |
| Corwin, Susan | 5 |
| Konner, Jack | 7 |
| Merrifield, John | 7 |
| Nelson, David | 7 |
| Project Total: 26 |
| Project Date: | 10/19/2006 |
| District: | Mount Adams Ranger District |
| Leader: | Brice Hammack |
| Location: | AmeriCorps - Crest Campground to Indian Racetrack |
| Description: | Trail maintenance. |
Volunteers |
Hours |
| Doty, Pat | 22 |
| Hammack, Brice | 22 |
| McLaughlin, Larry | 22 |
| Vetter, Dick | 22 |
| Project Total: 88 |
| Project Date: | 10/13/2006 |
| District: | Mount Adams Ranger District |
| Leader: | Tom Linde |
| Location: | AmeriCorps - Panther Creek |
| Description: | Trail maintenance. |
Volunteers |
Hours |
| Bubar, Marc | 43 |
| Byrue-Englehorn, Andrew | 43 |
| Cloutier, Suzi | 35 |
| Coudell, Joyce | 13 |
| Earnshaw, Sheri | 43 |
| Fallon, Candace | 43 |
| Linde, Tom | 31 |
| Lopert, Sarah Lee | 43 |
| Power, Brad | 43 |
| Savires, Bob | 42 |
| Taylor, Adam | 43 |
| Taylor, George | 43 |
| Project Total: 465 |
| Project Date: | 10/6/2006 |
| District: | Columbia River Gorge |
| Leader: | Brice Hammack |
| Location: | AmeriCorps - Table Mountain to Sedum Ridge |
| Description: | Trail maintenance. |
Volunteers |
Hours |
| Caris, Joel | 42 |
| DeRoberts, Marc | 42 |
| Dolan, Jessica | 42 |
| Eckrich, Carolyn | 42 |
| Hammack, Brice | 12 |
| Himelfarb, Eric | 22 |
| Webb, Jim | 12 |
| Project Total: 214 |
| Project Date: | 10/6/2006 |
| District: | Columbia River Gorge |
| Leader: | Brice Hammack |
| Location: | 2020 Road |
| Description: | Trail maintenance. AmeriCorps related. |
Volunteers |
Hours |
| Allen, Eric | 8 |
| Hammack, Brice | 8 |
| Project Total: 16 |